Vinyl siding installation should be left to the pros unless you're confident that you have adequate carpentry skills and experience. The upside of doing the project yourself is that you lot can cut the cost of installation to near half of what yous will likely beat out to hire a contractor. The installation of vinyl siding itself is not that hard, simply it does crave proper planning every bit well every bit precise measurements, calculations, cuts and leveling to ensure that the panels fit your wall perfectly.
The steps for vinyl siding installation below assume that you accept completed installing the panels for the soffit, which is the underside of the roof overhang, and the fascia, which is the horizontal band forth the bottom of the roof. For this project, you will demand the following tools:
Power saw Hammer Can snips Utility pocketknife Tape measure Chalk line Level Ladder
Apart from vinyl siding panels, the other needed materials are:
Starter strips J-trims Corner moldings Utility trims Baste caps Housewrap and A lot of nails, preferably those with wider heads Plywood
Keep in heed that fifty-fifty many pros prefer not to accept this job on lonely. Take one or 2 friends help you. Once y'all have all tools and materials listed higher up, you're prepare to have on this vinyl siding installation DIY.
Step Remove Obstacles
Clear the wall of anything that will go far the way of the vinyl siding such every bit exterior lamps, retractable clothesline spools, address plates or former vinyl sidings. Programme the disposal of your quondam siding properly. Don't mess with utility fixtures or the electrical meter. You need to work around them.
Measure from the eave downward to the bottom where y'all'll smash the starter strip. Well-nigh vinyl sidings are 12 feet long and eight inches wide. This means that if the distance between the eave and the lesser is divisible by eight inches, y'all can connect your top console direct to the J-trim. Well-nigh of the fourth dimension, however, you volition take to change your concluding top console and use a utility trim to install this last slice.
Find Your Level Points
Discover the level points at the bottom for the starter strip and mark them with the chalk line. Endeavour to be as precise as possible with the level points. This will brand the chore easier as you start installing the vinyl siding.
Adhere the Starter Strip and Vertical Trims
Align the starter strip carefully along the chalk line and nail it firmly to the wall. Nail 3 ½ inch by ½ inch plywood pieces along the top of the starter strip to brand it sturdier and help it hold up the vinyl siding panels. Adjacent, attach the vertical trims, including the corner posts and terminate channels. Yous may besides attach the trims around the windows and doors at this point.
Cut the Vinyl Sidings Co-ordinate to Length
Measure out the altitude between the vertical end posts and cut the vinyl panels co-ordinate to length for each row. Allow for a ¼ inch altitude between the stop of the siding and the corner post. Increase the altitude to ⅜ inch in areas where the temperatures become as low equally twoscore degrees Fahrenheit. Vinyl siding expands and contracts along with temperature fluctuations. The gap volition prevent harm to the siding.
Install the Vinyl Sidings
Sheath the kickoff few feet above the starter strip with the insulation or moisture protection material, and so snap and lock the showtime vinyl siding row on the starter strip. Nail the panels every maximum of 16 inches on the framing studs or furring on the wall. It is important to call up not to nail the vinyl sidings tightly confronting the wall and position the nail at the center of the slot; leave a 1/32 inch gap between the smash head and the vinyl siding. You've installed each panel correctly if the siding can freely motility from side to side. When you need to overlap panels to span a gap between posts, make sure that the panels overlap by near an inch. Work your mode upward around the wall cut around doors, windows and lamps using the tin snip.
Finish Up
As y'all reach the soffit on the eaves, measure the width that y'all need for the terminal piece in several locations and change the vinyl siding panel according to the measurements. Install a J-channel. Make tabs on the cutting border of the console every six inches using a snap lock punch. Install a utility trim into the J-aqueduct. Lock in the concluding console that y'all have modified on the last row and snap it into the utility trim on tiptop of the wall.